Cable length & bend radius
Measure the route once, let this add the drops, service loops and waste, and check it against the distance limits for the speed you need. Then make sure it isn't bent tighter than the cable can take, or crammed into conduit that's already full.
1 · Run length
TIA-568 guidance: leave ~3 m service loop in the comms room and ~0.3 m at the outlet. Copper runs are limited to 90 m permanent link plus 10 m of patch cords.
2 · Minimum bend radius
Bend radius is measured to the inside of the curve. Tight bends untwist pairs and crack fibre, and the damage usually only shows up as failed tests or intermittent faults later.